Project Description
The City of Amarillo is proposing to construct a grade separated roadway overpass crossing of NE 24th Avenue over the BNSF Railway main line and reconstruct the roadway approaches from NE 24th Avenue from N Lake Street to N Eastern Street.
Project contact information
If you have any general questions regarding the proposed project or virtual meeting or in-person option, please contact the City of Amarillo Engineering Department at (806) 378-9334 or engineeringdept@amarillo.gov.
Information concerning services and benefits available to affected property owners and information about the tentative schedule for right-of-way acquisition and construction can be obtained by calling Edgar Arellano at Kimley-Horn and Associates, Inc. at (806) 319-6378.
Project Details
The project would include 0.62 miles of NE 24th Avenue, and proposes a grade separated roadway overpass crossing of NE 24th Avenue over the Burlington Northern Santa Fe (BNSF) Railway main line at the existing at grade crossing.
The proposed bridge over the railroad would include four 12-ft travel lanes and a 10-ft shared use path (SUP) on the south side with rails along both sides of the SUP. The roadway approaches would be reconstructed to accommodate the four, 12-ft travel lanes, 16-ft local access roads for adjacent properties, retaining walls, curb and gutter, and a 10-ft wide SUP on the south side with rails on both sides within a proposed right-of-way width varying from 90 ft to 137 ft.
Although additional right-of-way would be required, no residential or non-residential structures are anticipated to be displaced at this time.
The National Environmental Policy Act (NEPA) requires federal agencies to account for the impacts of Federal government actions. This project is receiving funding from the Federal Railroad Administration (FRA); therefore, the environmental review for this project is being coordinated with FRA. This process ensures compliance with NEPA and other relevant federal environmental laws.