Addressing Amarillo’s Aging Infrastructure: Wastewater Treatment Plants

Addressing Amarillo’s Aging Infrastructure: Wastewater Treatment Plants

Published on

Email
Print

In the 1920s, Amarillo was booming – thanks in part to the discovery of natural resources such as helium. Amarillo’s population practically doubled during the decade, reaching more than 43,000 by the end of the 1920s.

During this period of rapid growth, the City of Amarillo (COA) built the River Road Wastewater Treatment Plant (RRWTP) in 1927 – a facility still in use today.

Fast forward about three decades to 1960, and Amarillo had grown again to more than 137,000 people. In 1965, the COA added the Hollywood Road Wastewater Treatment Plant (HRWTP)– a facility that is also still in use today.

As Amarillo’s population has continued to increase through the years to more than 203,000 residents, these two facilities exclusively (almost a combined 160 years old) have continued to serve a growing and ever-changing community. (Neither facility has undergone any major upgrades in more than 20 years.)

At the request of city council, the city is addressing the future of these vital pieces of Amarillo infrastructure and how the city prepares for the needs of residents.

Assistant City Manager Donny Hooper has made multiple wastewater treatment plant presentations to council, the latest coming last month.

“The city is looking at every option we have as we move forward with a plan,” Hooper said.

The latest plan presented to council includes a pivot from a previously discussed plan that does not include the construction of a singular wastewater treatment facility but rather facility improvements at the HRWTP in conjunction with expansion, along with the future rehabilitation of existing plant components.

Flood control issues at the HRWTP (which is in a floodplain) will also be addressed.

The RRWTP is undergoing an assessment to determine operational modifications and expansion for future growth.

The goal is for the community to have facilities capable of wastewater treatment for 10-15 years, with the ability to expand beyond this timeframe.

The new approach will lessen the cost of the project while meeting goals for regulatory compliance and also accounting for future growth.

As the project is in the preliminary phase for conceptual design, the city is evaluating several cost-saving measures and efficiencies that could reduce the overall project cost. A more defined cost estimate will be available when the preliminary engineering report is complete, and the project is scoped for design.

As the city explores all options, Hooper and other city officials visited Austin – a city facing a similar situation with its wastewater treatment plant.

“There were three big ticket items that we were looking at when we started down this process,” Hooper said. “First of all is the permitting issues that we have. Second of all would be the capacity associated with that and then the floodplain issues. They were facing the same things in Austin.”

As all are cities and municipalities in Texas, the City of Amarillo is monitored and regulated by the state when it comes to the operation of wastewater treatment plants.

“There are state requirements that all cities in Texas must meet,” Hooper said. “The city is deliberately taking its time through this process to make sure that we meet all state requirements. We are making sure that we get this project right.

“Replacing this aged infrastructure is vital for continued growth in Amarillo.”

For more information on COA water reclamation and wastewater treatment, go to:

www.amarillo.gov/water-utilities/water-reclamation/

To see and review the recent presentation to city council regarding the HRWTP and the RRWTP, go to Item 8B on the video index: https://amarillotx.new.swagit.com/videos/353719

Select A Language to Translate This Page

About Translations on Amarillo.gov

The City of Amarillo offers translations of content on Amarillo.gov through the Google Translate web translator (translate.google.com). Because Google Translate is an external service, the City does not control the quality or accuracy of translated content. As a result, some translations may contain inaccuracies, and there may be issues with the appearance of translated pages, including errors in images.

If you encounter incorrect or substandard translations, you can help improve them by contributing better translations using Google Translate:

  1. Hover over any text containing an error, and a pop-up box will appear.
  2. Click “Contribute a better translation.”
  3. Double-click the area of the pop-up that says “Click a word for alternative translations, or double-click to edit directly.”
  4. Make your edits directly in the text box.
  5. Press “Contribute” to submit your suggested changes.

For more information on contributing to Google Translate, visit Google Translate’s help page.

Please note that the City of Amarillo does not control the process by which contributed translations are incorporated into Google Translate.

The City of Amarillo is dedicated to enhancing the accessibility and multilingual content available on our website.

City of Amarillo: Property Taxes Rebated Per Year by Agreement Type 

Overview 

The chart shows the dollar amounts of property taxes rebated per year over the last five fiscal years, broken down by agreement type. There were no Chapter 380 property tax rebates in the first two years listed. The total amount increased slightly each year, with a more significant increase in the most recent year. 

Values 

Numerical values presented on the image: 

 

Fiscal Year 2020/2021 

Fiscal Year 2021/2022 

Fiscal Year 2022/2023 

Fiscal Year 2023/2024 

Fiscal Year 2024/2025 

Chapter 311 

$533,080 

$547,426 

$574,947 

$591,249 

$821,350 

Chapter 380 

$0 

$0 

$37,387 

$39,172 

$61,013 

Presentation 

The bar chart shows the amount of property taxes rebated in the past five fiscal years, broken down by agreement type. The horizontal axis shows each of the past five fiscal years and the vertical axis shows the dollar amount rebated. For each fiscal year there is vertical column, comprised of two stacked columns, each of which representing the different agreement types. 

City of Amarillo: Number of Tax Abatements Granted Per Year 

Overview 

The chart shows the number of businesses that received a tax abatement from the City of Amarillo in the past five fiscal years. The 2020/21 and 2021/22 fiscal years each had four active abatements, 2022/23 had five, and 2023/24 and 2024/25 each had seven. 

Values 

Numerical values presented on the image: 

 

Fiscal Year 2020/2021 

Fiscal Year 2021/2022 

Fiscal Year 2022/2023 

Fiscal Year 2023/2024 

Fiscal Year 2024/2025 

Active Abatements Per Year 

4 

4 

5 

7 

7 

Presentation 

The bar chart shows the number of businesses that received a tax abatement from the City of Amarillo in the past five fiscal years. The horizontal axis shows each of the past five fiscal years and the vertical axis shows the number of active abatements each year. Each year has one column, with the height indicating number of active abatements in that year.

Amount of Taxes Abated Per Year 

Overview 

The chart shows the dollar amounts abated over the past five fiscal years from Chapter 312 tax abatement agreements. Each fiscal year shows a larger dollar amount abated, with minor growth over the first three years, a higher increase in the fourth year, and minor growth again in the fifth year. 

Values 

Numerical values presented on the image: 

 

Fiscal Year 2020/2021 

Fiscal Year 2021/2022 

Fiscal Year 2022/2023 

Fiscal Year 2023/2024 

Fiscal Year 2024/2025 

Taxes Abated by City of Amarillo 

$510,061 

$623,017 

$679,849 

$965,261 

$1,143,899 

Total Abated by All Entities Including City of Amarillo 

$1,569,512 

$1,926,332 

$2,103,099 

$2,884,936 

$2,959,496 

Presentation 

The bar chart represents the amount of taxes abated over the past five fiscal years. The horizontal axis shows each of the past five fiscal years and the vertical axis shows the dollar amount abated. The bar representing taxes abated by the City of Amarillo is sightly offset to the side of the bar representing the amount abated by all participating tax entities for each fiscal year. This shows that the amount abated by the City of Amarillo is a part of the total amount abated by all entities.

City of Amarillo: Taxes Rebated Per Year by Type 

Overview 

This chart shows the dollar amounts rebated by the City of Amarillo from economic development incentive agreements over the past five fiscal years. Each year is broken down by rebate type, including property tax rebates, hotel occupancy tax rebates, and sales tax rebates. Each fiscal year shows a slight increase in total dollars rebated, with a more drastic increase in the most recent fiscal year. 

Values 

Numerical values presented on the image: 

 

Fiscal Year 2020/2021 

Fiscal Year 2021/2022 

Fiscal Year 2022/2023 

Fiscal Year 2023/2024 

Fiscal Year 2024/2025 

Property Tax Rebates 

$533,080 

$547,426 

$612,334 

$630,421 

$882,363 

Hotel Occupancy Tax Rebates 

$686,747 

$753,112 

$794,828 

$871,423 

$808,348 

Sales Tax Rebates 

$0 

$21,046 

$55,528 

$45,881 

$368,716 

 

Presentation 

The bar chart represents the amount rebated by the City of Amarillo for each type of tax rebate over the past five fiscal years. The horizontal axis shows each of the past five fiscal years and the vertical axis shows the dollar amount rebated. The different rebate types are stacked vertically in each fiscal year, with the height representing the total dollar amount rebated.