Road Closures Scheduled on Teckla Boulevard for Utility Project
The City of Amarillo Utilities Division is scheduled to begin a project to re-line an existing 30” water transmission main. The project will extend from the 2900 block of the alley between Teckla Boulevard and Harmony Street to the 2000 block of Teckla Boulevard. Re-lining the existing main is a method designed to minimize the [...]